Special Provisions for all trunk highway construction projects

Special Provision boilerplates are used to prepare the project specific division special provisions for MnDOT-let construction projects. See Proposal Sequence below for links to other boilerplate divisions.

The Time and Traffic Provisions, CMGC and IDIQ boilerplate special provisions have been incorporated into the Boilerplate SP2020 file.

The effective letting date for using the SP2020 Boilerplate Special Provision updated June 30, 2023 is October 1, 2023 per Technical Memorandum 23-02-TS-01, Dissolution of Supplemental Specifications to the MnDOT Standard Specifications for Construction, 2020 Edition.

Submit questions and comments about Special Provisions to [email protected].

Special Provisions 2020 boilerplates

Special Provisions guidance

Proposal sequence

The proposal order indicates the make up of the complete bidding proposal.

Sequence Title When used
1 Title Sheet (No standard file – project specific) All
2 To the Commissioner of Transportation of the State of Minnesota (PDF) All
3 Notice to all Bidders – Bid Rigging (PDF) Federal
4 MnDOT Notice to Bidders: Suspension/Debarments (PDF) All
5 State Funded Only Construction Contracts – Special Provisions Division A - Labor (PDF) State Only
6 Federally and State Funded Construction Contracts - Special Provisions Division A - Labor (PDF) Federal and State
7 Federally Funded Only Construction Contracts – Special Provisions Division A - Labor (PDF) Federal Only
8 Notice to Bidders Traffic Control Prevailing Wage Coverage (PDF) Federal
9 Federal Wage Rates (Highway; Heavy; Building) Federal
10 State Wage Rates (Highway and Heavy; Commercial) All
11 Notice of Truck Rental Rate Certification and Effective Date All
12 Notice to Bidders Work Under the Contract (PDF) All
14 Division S All
NA Division SB If required
NA Division SL If required
NA Division SS If required
NA Division ST If required
NA Division SZ If required
NA Other Division Special Provisions If required
15 (1803) Project Schedules (PDF) All
16 (1910) Fuel Escalation Clause (PDF) All
17 Conversion Table for MnDOT Rolled Erosion Prevention Products (PDF) Use only with SP2018 if required
18 Blanding’s Turtles Fact Sheet (PDF) Use only with SP2018 if required
19 Blanding’s Turtle Flyer (PDF) Use only with SP2018 if required
20 NOTIFICATION FORM ON OWNERSHIP TRANSFER OF MATERIALS WITH LEAD-BASED PAINT (Word) If required
21 Demolition Debris Recycling Form (Word) If required
22 Schedule of Materials Control 2018 Projects using the 2018 Standard Specifications
23 Schedule of Materials Control 2020 (PDF) Projects using the 2020 Standard Specifications let before July 28, 2023
24 Schedule of Materials Control 2023 Version (PDF) Projects using the 2020 Standard Specifications let on or after July 28, 2023
25 Disadvantaged Business Enterprise (DBE) Special Provisions (PDF) Federal
26 Targeted Group Business (TGB) and Veteran-Owned Small Business (VET) Special Provisions (PDF) State
27 Required Contract Provisions Federal-Aid Construction Contracts (FHWA-1273) (PDF)
Federal
28 Equal Employment Opportunity (EEO) State and Federal Laws, Policy and Rules (PDF)
All
29 Notice to Bidders - Bid Schedule All
30 Stipulation for Iron or Steel Materials (PDF) Federal
Use only with SP2018 if required
31 Bid Schedule (No Standard File - project specific) All
32 MnDOT Proposal Bond (PDF) All
33 Construction Plan (No standard file – project specific) All